Van Phong Bonded Petroleum

21 Tháng Mười Hai, 2020

PROJECT: VAN PHONG BONDED PETROLEUM TERMINAL

LOCATION: VAN PHONG Terminal

PACKAGE: Tank Gauging System + Metering system + Control system + Manual Valve & Control Valve

PACKAGE: Ship loading system

PACKAGE: Truck loading station

 

Project References

Project References

24 November, 2020
OUR TEAM OF ENGINEERING PROFESSIONALS OFFERS EXPERT DESIGN AND DEVELOPMENT RIGHT UP TO COMMISSIONING AND INSTALLATION
CHIM  SAU (BLACK BIRD) FPSO

CHIM SAU (BLACK BIRD) FPSO

21 December, 2020
PROJECT: CHIM SAU (BLACK BIRD) FPSO METERING AND PROVING - CAPACITY 5,000 M3/HR
HOANG LONG FPSO

HOANG LONG FPSO

24 November, 2020
HOANG LONG FPSO METERING AND PROVING - CAPACITY 5,000 M3/HR  
(+84-28) 3911 0183