Van Phong Bonded Petroleum

24 Tháng Mười Một, 2020

PROJECT: VAN PHONG BONDED PETROLEUM TERMINAL

LOCATION: VAN PHONG Terminal

PACKAGE: Tank Gauging System + Metering system + Control system + Manual Valve & Control Valve

PACKAGE: Ship loading system

PACKAGE: Truck loading station

 

Project References

Project References

24 November, 2020
OUR TEAM OF ENGINEERING PROFESSIONALS OFFERS EXPERT DESIGN AND DEVELOPMENT RIGHT UP TO COMMISSIONING AND INSTALLATION
CHIM  SAU (BLACK BIRD) FPSO

CHIM SAU (BLACK BIRD) FPSO

21 December, 2020
PROJECT: CHIM SAU (BLACK BIRD) FPSO METERING AND PROVING - CAPACITY 5,000 M3/HR
HOANG LONG FPSO

HOANG LONG FPSO

24 November, 2020
HOANG LONG FPSO METERING AND PROVING - CAPACITY 5,000 M3/HR  
Van Phong Bonded Petroleum

Van Phong Bonded Petroleum

21 December, 2020
Tank Gauging System + Metering system + Control system + Manual Valve & Control Valve  
PD meter for Pekn Resin factory

PD meter for Pekn Resin factory

24 November, 2020
for Pekn Resin factory
Noi Bai Aviation Fuel Service

Noi Bai Aviation Fuel Service

24 November, 2020
OVAL - Stainless Steel PD meter (NAFSC)
HOANG  LONG (TGT)

HOANG LONG (TGT)

24 November, 2020
FPSO METERING AND PROVING - CAPACITY 5,000 M3/HR  
NGHI SON REFINERY

NGHI SON REFINERY

24 November, 2020
   
RUBY PRINCESS II

RUBY PRINCESS II

24 November, 2020
 FPSO METERING AND PROVING - CAPACITY 3,200 M3/HR  

Partner

img
img
img
img
img
img
img
img
img
img
img
img
(+84-28) 3911 0183