HOANG LONG (TGT)

07 Tháng Năm, 2025

PROJECT: HOANG LONG (TGT) FPSO METERING AND PROVING - CAPACITY 5,000 M3/HR

LOCATION: VIETNAM

Project References

Project References

24 November, 2020
OUR TEAM OF ENGINEERING PROFESSIONALS OFFERS EXPERT DESIGN AND DEVELOPMENT RIGHT UP TO COMMISSIONING AND INSTALLATION
CHIM  SAU (BLACK BIRD) FPSO

CHIM SAU (BLACK BIRD) FPSO

21 December, 2020
PROJECT: CHIM SAU (BLACK BIRD) FPSO METERING AND PROVING - CAPACITY 5,000 M3/HR
HOANG LONG FPSO

HOANG LONG FPSO

24 November, 2020
HOANG LONG FPSO METERING AND PROVING - CAPACITY 5,000 M3/HR  
(+84-28) 3911 0183